Understanding the specific pressures manufacturers in this sector face every day.
Maximize packaging and converting line performance by eliminating speed losses, improving equipment reliability, and maintaining consistent production throughput.
Reduce material waste and production losses by identifying process inefficiencies, monitoring quality trends, and optimizing converting operations.
Improve product consistency through real-time production visibility, performance monitoring, and faster identification of quality deviations across lines and shifts.
Reduce changeover times and improve production flexibility through standardized processes, operational support, and continuous improvement initiatives.
Digital work instructions to standardise operator processes and improve first-time-right quality.
Learn More →Real-time OEE monitoring and production analytics for full visibility across all lines.
Learn More →A packaging converter was running 12+ changeovers per week with an average 85-minute changeover time, limiting capacity and forcing overtime to meet customer commitments.
GPM applied SMED methodology to redesign the changeover process, implemented digital changeover procedures via VIPs, and trained all operators across 3 shifts.
SMED (Single Minute Exchange of Die) is a lean methodology to reduce changeover time. A typical SMED project for a single line takes 4–8 weeks and commonly delivers 30–50% changeover time reductions.