Understanding the specific pressures manufacturers in this sector face every day.
Maintain stable tissue and paper converting operations by minimizing process variability, improving machine reliability, and ensuring consistent production quality across high-speed lines.
Reduce unplanned downtime by identifying recurring equipment failures, production bottlenecks, and operational inefficiencies before they impact output.
Maximize equipment performance through operational support, continuous improvement initiatives, and data-driven optimization that increases Overall Equipment Effectiveness (OEE).
Improve converting performance by reducing material waste, optimizing changeovers, increasing throughput, and maintaining consistent line stability.
Digital work instructions to standardise operator processes and improve first-time-right quality.
Learn More →Real-time OEE monitoring and production analytics for full visibility across all lines.
Learn More →A new greenfield tissue mill required expert commissioning support to bring a high-speed tissue machine to design speed within an aggressive 6-month schedule.
GPM provided a dedicated commissioning team covering mechanical, electrical, process, and quality disciplines from FAT through to ramp-up completion.
GPM has commissioning and operations experience with Valmet, Andritz, Toscotec, Körber, Fabio Perini, Perini, PCMC, and other major tissue and paper OEMs.
Through GPRM remote support, GPM engineers can typically connect to a tissue line within 30–60 minutes of a support request. For on-site requirements, we can mobilise to most global locations within 24–72 hours.